
KENWOOD ELEMENTARY GYMNASIUM
Rebuilding the Kenwood Elementary Gymnasium helped heal the community.
MADISON RESIDENCE
After losing their home to a fire in 2017, the project owners aimed to build a replacement that was similar in design but stronger and more fire-resistant. The fire had extensively damaged the site, which necessitated a complete demolition of the old structure, including the former basement, prior to the construction of the new ICF home.
Resources

LUXE REEL THEATER
The project is a key feature and gathering place in a small city that is planning substantial city-wide redevelopment. The new 11-screen theater is a focal point of this effort and has introduced the region to ICF and the benefits of building with this method.
Events

CENTRE PARK HOLIDAY INN & CONFERENCE CENTER
Use of Fox Blocks in this project contributed to saving 2 months in construction.

PHOENIX 911 EMERGENCY OPERATIONS CALL CENTER
Fox Blocks helped meet these needs and challenges of this public project serving the entire Phoenix metropolitan area.