
LANDSCAPE RETAINING WALL
The challenge for this build was to create a home that would appeal to a sophisticated buyer with features that an empty nester moving from a larger more expansive home would enjoy. The result is an energy efficient home which creatively uses space in an attractive, luxurious, and cost effective way.

GEORGETOWN INDEPENDENT SCHOOL DISTRICT
Ashbury Hills Elementary School is the first complete school built with ICFs in the state of Nebraska, and its gymnasium was built to full height with Fox Blocks.

The Anatomy of a High Performance Home
A modern, high-performance home provides you with energy-efficiency, safety, and a high-level of indoor environment quality (IEQ) for your family’s comfort.

Why ICF is a Best Practice in Constructing Public Safety Buildings
Fox Block ICF public safety buildings provide first responders a safe, healthy, and quiet environment.

WHITEWATER CROSSING CHRISTIAN CHURCH
Fox Blocks provided a structural system that allowed the existing church to be expanded.
Press Release: Fox Blocks ICFs Announces New Spanish Integrated Learning Center (ILC) | Fox Blocks ICFs anuncia nuevos Centro De Aprendizaje

HILLIARD BRUCE WINERY
Hilliard Bruce Winery was awarded LEED Silver Certification by the US Building Council.

Integrated Design in Architecture and Construction
In the field of architecture and construction, integrated design is a powerful solution that tackles the inefficiencies of traditional isolated processes. This approach combines different project elements under a unified vision, and proves particularly effective with Insulated Concrete Forms (ICF) like those from Fox Blocks. By using ICF, the building process becomes more efficient and collaborative.

COZZI RESIDENCE
This massive estate features 7,000 square feet of living space and another 6,000 square feet of decks, porches, lofts, and more. To help achieve the rustic-contemporary look of the home, amazing ICF gables were used to create the daylight windows that provide a beautiful view of the surrounding forest.

CABELA’S
Constructed during one of the worst winters in over 30 years, having over 8′ of snow fall during the 12 weeks of Fox Blocks construction.