PHNX1 Palos Residence IMG 6157
PHNX1/PALOS RESIDENCE
First Type II Non-Com­bustible, Net-Zero Home in the U.S. This home was designed, built and com­plet­ed in less than 21 months with the same cost as a tra­di­tion­al build.
2014 SHORE ROAD RESIDENCE 11
SHORE ROAD RESIDENCE
It is not an over­state­ment to say that The Shore Road Project is the own­ers’ dream home.
Zero Place Southeast corner
ZERO PLACE
A Zero-Ener­gy Liv­ing Con­cept for a Brighter and Green­er Future. Zero Place is a ground­break­ing devel­op­ment boast­ing zero-ener­gy liv­ing in its four-sto­ry mixed-use build­ing with 46 mul­ti-fam­i­ly units and 8,400 square feet of retail space.
2016 MESKWAKI TRAVEL PLAZA 9
MESKWAKI TRAVEL PLAZA
The Meskwa­ki Trav­el Plazais a full-ser­vice trav­el cen­ter includes a truck­ers’ lounge, con­ve­nience store, and 50’s themed din­er.
Screen Shot 2020 02 10 at 2 39 13 PM
Reduce Commercial Building Construction Costs with ICF
Powell-full-finished
POWELL COUNTY EOC
Pow­ell Coun­ty Emer­gency Oper­a­tions Cen­ter is designed to meet FEMA require­ments for chem­i­cal agent emer­gen­cies and storm resis­tance.
2017 heidleberg people
HEIDLEBERG APARTMENTS
This build­ing is one of the first to offer afford­able hous­ing for both adults on the autism spec­trum and for those who are not on the spec­trum.
Copy of Everett L Williams exterior front entrance
GEORGETOWN INDEPENDENT SCHOOL DISTRICT
Ash­bury Hills Ele­men­tary School is the first com­plete school built with ICFs in the state of Nebras­ka, and its gym­na­si­um was built to full height with Fox Blocks.
MACNAK CONSTRUCTION CORPORATE OFFICE 11
MACNAK CONSTRUCTION CORPORATE OFFICE
Mac­nak Con­struc­tion uti­lized sev­er­al new con­struc­tion prod­ucts in its new ener­gy effi­cient office build­ing.