Fox Blocks for Hickman Farms Labor Housing 2018

Fox Blocks for Hickman Farms Labor Housing 2018

What's In Your Air?
We face envi­ron­men­tal pol­lu­tion every day we step out­side our door.
When can I backfill the foundation wall?
The con­crete must cure for a min­i­mum of 7 days and the foun­da­tion wall must be lat­er­al­ly sup­port­ed, mean­ing the floor sys­tem is installed sup­port­ing the top of the wall. All below grade water­proof­ing / damp­proof­ing must be installed.

1.18.01 Installer Training and Qualifications (Spanish)

Fox1
Fox Blocks Wins Big at the 2020 ICF Builder Awards
Image1
How to Assess Contractors for Building with ICFs