Berlin Encore Boutique Hotel, Event Center & Theatre
Can ICF Save You Time On Your Commercial Project?
This arti­cle will out­line the impor­tance of con­struc­tion work­flow in com­mer­cial projects, the process­es that often take the most time dur­ing con­struc­tion, the ben­e­fits of using ICF and how specif­i­cal­ly Fox Blocks’ ICF can help save time and costs on your next project.
Do I need an engineer to design and stamp Fox Blocks building plans?
Fox Blocks are list­ed in the build­ing codes (IRC- Sec­tions R404, R611 or NBCC Part 9) with spe­cif­ic applic­a­bil­i­ty lim­its for res­i­den­tial con­struc­tion. If the project meets the applic­a­bil­i­ty lim­its with­in the build­ing code, a Pro­fes­sion­al Engi­neer may not be required (depen­dent on local build­ing depart­ment require­ments). A build­ing offi­cial has the right to request engi­neer­ing and in some regions all projects require a professional’s stamp. For any projects that exceed the applic­a­bil­i­ty lim­its, a Pro­fes­sion­al Engi­neer is required for the struc­tur­al design. Check with your local build­ing depart­ment.
Image2
Pool House Construction: Costs, Materials, Plans, and More
Can you build and pour concrete in cold weather?
Yes. The forms insu­late the con­crete and enhance the cur­ing process. The top of the forms, or exposed con­crete areas will need to be cov­ered, tem­porar­i­ly, with insu­la­tion to pre­vent the exposed con­crete from freez­ing. Fox Blocks projects can be con­struct­ed any time of the year, no delays for cold weath­er.
The Fox Blocks Line-Up at a Glance
With advice from lead­ing con­trac­tors in the Insu­lat­ed Con­crete Form busi­ness, Fox Blocks has cre­at­ed an incred­i­ble group of blocks.
ICF Builder Awards Round Up
We thought we’d share a round up of some of our pre­vi­ous awards.
Screen Shot 2019 08 01 at 12 16 42 PM
5 Common Misconceptions About ICF Construction
ICF con­struc­tion cre­ates mod­ern struc­tures that are ener­gy-effi­cient, durable, dis­as­ter-resis­tant, and have good indoor envi­ron­men­tal qual­i­ty (IEQ). ICF con­struc­tion is also strong, flex­i­ble, fast and easy to install. Unfor­tu­nate­ly, even with these many ben­e­fits, some archi­tects and con­trac­tors are reluc­tant to uti­lize it due to mis­con­cep­tions about ICF con­struc­tion.
Simple Ways to Save Money On Your Build
As builders and buy­ers look to con­tin­u­al­ly fight ris­ing costs, mak­ing small changes and minor sub­sti­tu­tions, as a way of val­ue engi­neer­ing, can large­ly impact the final cost of a build.
Screen Shot 2024 02 05 at 8 47 42 AM
How Long Does It Take to Build a House in California?
Build­ing a house in Cal­i­for­nia offers unique chal­lenges and oppor­tu­ni­ties due to its diverse cli­mate, geog­ra­phy, and strin­gent build­ing reg­u­la­tions. This arti­cle explores the spe­cif­ic fac­tors influ­enc­ing con­struc­tion time­lines in Cal­i­for­nia.
Screen Shot 2020 02 10 at 2 58 14 PM
17 Innovative Construction Trends for 2020