Kenwood 1
KENWOOD ELEMENTARY GYMNASIUM
Rebuild­ing the Ken­wood Ele­men­tary Gym­na­si­um helped heal the com­mu­ni­ty.
Copy of 14 Finished Exterior
SHOP BUILDING AND GARAGE
The project was built to cre­ate a sound and visu­al bar­ri­er between the neigh­bor­ing home after a sec­tion of trees on the side yard that joined the two prop­er­ties was cleared.
Image14
16 ICF Modern Farmhouse Floor Plans and Design Ideas
Building new home
Designing Homes for Aging in Place
For­tu­nate­ly, with the grow­ing pop­u­lar­i­ty of sus­tain­able and acces­si­ble design, it’s eas­i­er than ever to help clients cre­ate a space that will meet their chang­ing needs over the years. Con­sid­er these options for clients who want to plan for the future while ensur­ing style, com­fort and func­tion­al­i­ty for today.
LAKE POWELL RESIDENCE
Lux­u­ri­ous Cus­tom Home with a Pri­vate Putting Green and Stun­ning Views. The Lake Pow­ell Res­i­dence is sur­round­ed by stun­ning bluffs. With its mod­ern res­i­den­tial design and open-con­cept floor plan, the large out­door decks and patios embrace the beau­ty of the sur­round­ing nature. The back­yard fea­tures a pri­vate putting green with three prac­tice holes and sand trap bunkers for golf prac­tice.
Hooper Avenue Apartments IMG 7904
HOOPER AVENUE APARTMENTS
Mod­ern, Ener­gy-Effi­cient Apart­ments Over­come Alaskan Tem­per­a­tures. Hoop­er Avenue Apart­ments boast low ener­gy costs and com­fort­able liv­ing tem­per­a­tures with a seam­less con­struc­tion process.
Contractors Can Use Traditional Building Measurements with ICF Studs when They Choose Fox Blocks
6 Little Known Energy Wasters Affecting Your Low-Rise Construction
By iden­ti­fy­ing these ener­gy wasters, you can take the nec­es­sary steps to make the build­ing more effi­cient.
1
How Much Does It Cost to Build a 30,000 Sq Ft Warehouse?
By choos­ing prac­ti­cal, sus­tain­able solu­tions, busi­ness­es can effec­tive­ly man­age the cost to build a 30,000 sq ft ware­house while boost­ing effi­cien­cy.
1
The Changing Landscape of K-12 School Construction in 2025
School con­struc­tion for K‑12 is chang­ing to meet today’s high­er per­for­mance expec­ta­tions. It’s about find­ing the right bal­ance between keep­ing costs man­age­able, build­ing strong, durable struc­tures, and mak­ing schools more ener­gy-effi­cient.