2016 CABELAS 13
CABELA’S
Con­struct­ed dur­ing one of the worst win­ters in over 30 years, hav­ing over 8′ of snow fall dur­ing the 12 weeks of Fox Blocks con­struc­tion.

Intertek Certification Codes and Testing Standards Mar 2016

Fox Blocks Recognized at 2016 ICF Builder Awards
Fox Blocks is proud to announce win­ning sev­er­al awards this year and would like to thank our part­ners through­out the indus­try. With­out our team, win­ning these pres­ti­gious awards would not be pos­si­ble.
2016 GRAYMOOR FRIARY 5
GRAYMOOR FRIARY
Fox Blocks was used to sup­port the Friary’s 200-year life expectan­cy for the facil­i­ty.
2016 MILTON RESIDENCE 6
MILTON RESIDENCE
The own­ers want­ed an afford­able cus­tom home that could with­stand Chesa­peake Bay weath­er.
2016 HILLIARD BRUCE WINERY 7
HILLIARD BRUCE WINERY
Hilliard Bruce Win­ery was award­ed LEED Sil­ver Cer­ti­fi­ca­tion by the US Build­ing Coun­cil.
2016 MESKWAKI TRAVEL PLAZA 9
MESKWAKI TRAVEL PLAZA
The Meskwa­ki Trav­el Plazais a full-ser­vice trav­el cen­ter includes a truck­ers’ lounge, con­ve­nience store, and 50’s themed din­er.
2016 CHRISTIAN LIFE CENTER finished 2 sign
CHRISTIAN LIFE CENTER
The build­ing fea­tures an impres­sive mix of tall wall ICF, steel, and glaz­ing.
2016 PARK CITY SOUND STUDIO 12
PARK CITY SOUND STUDIO
As with all movie stu­dio projects, sched­ule was a crit­i­cal ele­ment for this film pro­duc­tion facil­i­ty.