6 Trends for New Resident Hall Dormitory Design and Construction 1
6 Trends for New Resident Hall - Dormitory Design and Construction
Unit­ed States (U.S.) stu­dent hous­ing con­struc­tion projects are expe­ri­enc­ing rapid growth, with invest­ments in stu­dent hous­ing reach­ing $9.8 bil­lion in 2016 and $8 bil­lion in 2017.
Do I need an engineer to design and stamp Fox Blocks building plans?
Fox Blocks are list­ed in the build­ing codes (IRC- Sec­tions R404, R611 or NBCC Part 9) with spe­cif­ic applic­a­bil­i­ty lim­its for res­i­den­tial con­struc­tion. If the project meets the applic­a­bil­i­ty lim­its with­in the build­ing code, a Pro­fes­sion­al Engi­neer may not be required (depen­dent on local build­ing depart­ment require­ments). A build­ing offi­cial has the right to request engi­neer­ing and in some regions all projects require a professional’s stamp. For any projects that exceed the applic­a­bil­i­ty lim­its, a Pro­fes­sion­al Engi­neer is required for the struc­tur­al design. Check with your local build­ing depart­ment.
Screen Shot 2020 02 10 at 3 56 50 PM
House Framing 101 - How to Select the Best Framing Option for Your Home
1
How Much Does It Cost to Build a 5,000 Sq Ft Warehouse?
Every ware­house begins with a num­ber, the cost per square foot that sets expec­ta­tions for design and deliv­ery. The cost to build a 5000 sq ft ware­house isn’t fixed; it shifts with site con­di­tions, mate­r­i­al choic­es, and ener­gy goals.
ICF Safe Rooms 1
Why Fox Blocks ICF Safe Rooms Provide the Best Protection During Dangerous Wind Events
Fox Blocks 5 man hours on job and 4 courses up

Fox Blocks 5 man hours on job and 4 courses up

WOC 2011 - Great Kick Off
Trav­el­ing back to my home/​office in Atlanta from the recent World of Con­crete Show in Las Vegas, I was able to reflect on some of our company’s recent achieve­ments. The recent World of Con­crete show gave our com­pa­ny a plat­form or per­fect oppor­tu­ni­ty to…
Properly Placing The Concrete
Depend­ing on the forms’ size and the con­crete core width, the con­crete aggre­gate size and slump should be adjust­ed accord­ing­ly. The ulti­mate goal is to get the cor­rect com­pres­sive strength for the con­crete as spec­i­fied.