ACADIA COLONY POTATO BARN
Fox Blocks ICF offered an energy-efficient solution for a building full of pressurized moisture because moisture does not affect the ICF, even over the long term. Potato storage is at a constant 100% relative humidity and 1.5 cfm pressure, which causes other forms of construction to go through complex detailing to keep moisture out of the wall cavity.

Dominion Springs Plaza
This high-end, multi-building, retail plaza was the first of its kind in the world of ICF construction.
Insulated Concrete Form Estimator
Fox Blocks Estimator PRO4 is now LIVE and available to download and use for project take offs and estimates! Estimate ICF quantities including specialty blocks, opening material, ancillary products, lineal feet of rebar, volume of concrete and man hours for a specific job.

HELL ROARING RANCH AIR HANGAR
This unique air hangar is the first of its kind in terms of ICF applications. The design of this building was not intended to stand out, but to conform and fit its environment. With beautiful wood and stonework exterior finishes and the steep rake of the roof down to the embankment in which the hangar is nestled, the building elegantly blends into the beautiful Idaho surroundings without being obtrusive.
Properly Placing The Concrete
Depending on the forms’ size and the concrete core width, the concrete aggregate size and slump should be adjusted accordingly. The ultimate goal is to get the correct compressive strength for the concrete as specified.
Fox Blocks Announces Membership in the NRMCA
We are excited to announce that Fox Blocks is now a member of the National Ready Mix Concrete Association (NRMCA).

HURRICANE HARVEY REBUILD
The owners’ former home, destroyed by Hurricane Harvey, was the touchstone for family gatherings for nearly two decades, and its loss was devastating for the family.

MILTON RESIDENCE
The owners wanted an affordable custom home that could withstand Chesapeake Bay weather.
MADISON RESIDENCE
After losing their home to a fire in 2017, the project owners aimed to build a replacement that was similar in design but stronger and more fire-resistant. The fire had extensively damaged the site, which necessitated a complete demolition of the old structure, including the former basement, prior to the construction of the new ICF home.

The Challenges of Building a Net Zero, Storm-Resistant Home
Building a home that stands up to severe weather and flooding is one thing. Designing a net zero energy custom home that your clients will love is another.