What fasteners are recommended for ICFs?

Fox Blocks has con­duct­ed numer­ous fas­ten­er tests for pull-out strength and shear capac­i­ty for var­i­ous fas­ten­ers – screws, ring shank nails and sta­ples into the plas­tic webs. The rec­om­men­da­tion for inte­ri­or and exte­ri­or appli­ca­tions of fin­ish mate­ri­als is for the use of screws which pro­vide the best hold­ing capac­i­ty into the plas­tic webs or fas­ten­ing strips in the forms which are iden­ti­fied on each block.

The EPS insu­la­tion does not pro­vide any hold­ing capac­i­ty for fas­ten­ers.

When can I backfill the foundation wall?
The con­crete must cure for a min­i­mum of 7 days and the foun­da­tion wall must be lat­er­al­ly sup­port­ed, mean­ing the floor sys­tem is installed sup­port­ing the top of the wall. All below grade water­proof­ing / damp­proof­ing must be installed.
Can I install a 16' garage door and / or large openings in a concrete wall?
Yes, if the fol­low­ing cri­te­ria is avail­able for the design of a con­crete lin­tel (beam) over the open­ing – con­crete lin­tel depth min­i­mum 16″ (400 mm) or more with no point loads. Larg­er open­ings would require an engi­neered design.
Does the EPS provide support for a wood sill plate?
No, the EPS has no struc­tur­al capac­i­ty to sup­port any loads. Wood sill plates must achieve the required bear­ing from the con­crete with­in the ICF. A wood plate that can­tilevers 13 over the EPS and bears 23 on the con­crete is allow­able. This can be done with a min­i­mum 2 x 6 plate. If a 24 plate is required, a taper top form should be used to extend the con­crete under the plate.
How do frame in openings?
Fox Blocks has devel­oped the Fox Buck specif­i­cal­ly to frame open­ings such as win­dows and doors. The Fox Buck pro­vides insu­la­tion around the open­ing plus sup­port for the attach­ment of the win­dow or door.
Is an ICF house faster to build?
The assem­bly and place­ment of con­crete may take the same time as to build with con­ven­tion­al meth­ods. The advan­tage with Fox Blocks is that the walls are now insu­lat­ed, have a vapor and air bar­ri­er installed and are ready for fin­ish­es once the win­dows and roof are installed. These ben­e­fits will save weeks and/​or months depend­ing on the size of the projects.
Can you vibrate or consolidate the concrete in ICFs?
Yes, con­sol­i­da­tion of the con­crete is one of the key ele­ments in the place­ment of con­crete in an ICF wall. Fox Blocks rec­om­mends inter­nal vibra­tion with a pen­cil vibra­tor, quick­ly in and slow­ly out.
Do ICFs require a special concrete mix design?
The con­crete is nor­mal strength, min­i­mum 2500 psi (20 MPa) per build­ing codes. The mix design spec­i­fies a small­er aggre­gate and high­er slump than con­crete typ­i­cal­ly used for floors. Most Ready-Mix sup­pli­ers are famil­iar with an ICF con­crete mix design.
Why is the concrete limited to a placement height or lifts of 4 feet (1.2 m)?
To alle­vi­ate the pres­sure from the liq­uid con­crete, the con­crete is placed in lay­ers or lifts’. The first lift is lim­it­ed to 4′ (1.2 m) of con­crete around the perime­ter of the build­ing. This allows approx­i­mate­ly one hour for the con­crete to set-up before con­tin­u­ing with the next 4′ (1.2 m) lift. The low­er lift pro­vides sup­port for the next lift as the con­crete is placed con­tin­u­ous­ly around the build­ing in con­sec­u­tive lifts to the top of the wall.
Is there a problem when placing concrete, dropping concrete from the top of the wall which may be over 8' (2.4 m)?
No. Spec­i­fi­ca­tions in the Amer­i­ca Con­crete Insti­tute (ACI) do not lim­it the max­i­mum dis­tance con­crete can free fall. Engi­neer­ing stud­ies and reports have shown that free fall from up to 35′ doesn’t reduce con­crete qual­i­ty and there is no evi­dence of seg­re­ga­tion or weak­ened con­crete strength. ICF con­crete design calls for a high slump mix which assists in reduc­ing seg­re­ga­tion.