911 center finished again
PHOENIX 911 EMERGENCY OPERATIONS CALL CENTER
Fox Blocks helped meet these needs and chal­lenges of this pub­lic project serv­ing the entire Phoenix met­ro­pol­i­tan area.
1
How Long Does It Take to Frame a House?
Won­der­ing how long it takes to frame a house? Dis­cov­er the key fac­tors that influ­ence the time­line and what to expect dur­ing the fram­ing process!
Combat Rising Construction Labor Costs with ICF 4
Combat Rising Construction Labor Costs with ICF
Image2
The Power of Insulated Concrete Forms: Maximizing R-Value in Your Construction Project
PIE EYED MONK BREWERY
A 150-year-old grain­ery build­ing was trans­formed into a restau­rant and micro­brew­ery in Ontario by a cou­ple look­ing to revi­tal­ize their com­mu­ni­ty and join the up-and-com­ing craft beer mar­ket.
22 story finished 1
“22 STORY” STUDENT DORMITORY
This 104,000 square foot project won an ICF Builder Award.
COCA COLA PAVILLION 13
COCA-COLA PAVILLION
This project is an icon­ic cor­ner­stone at the Dis­ney Springs enter­tain­ment com­plex at Walt Dis­ney World.
Copy of Santa Rita Ranch exterior2
ST. MATTHEW CATHOLIC CHURCH
Dis­cov­ery is one of the four schools to receive the zero ener­gy cer­ti­fi­ca­tion, nation­wide.
DJI 0107
MADISON RESIDENCE
After los­ing their home to a fire in 2017, the project own­ers aimed to build a replace­ment that was sim­i­lar in design but stronger and more fire-resis­tant. The fire had exten­sive­ly dam­aged the site, which neces­si­tat­ed a com­plete demo­li­tion of the old struc­ture, includ­ing the for­mer base­ment, pri­or to the con­struc­tion of the new ICF home.
Icf block systems
ICF Blocks For Residential Construction: Reliable, Long-Lasting Walls