Centre finished
CENTRE PARK HOLIDAY INN & CONFERENCE CENTER
Use of Fox Blocks in this project con­tributed to sav­ing 2 months in con­struc­tion.
2017 ARTURO FUENTE CIGAR WAREHOUSE 16
ARTURO FUENTE CIGAR WAREHOUSE
Locat­ed in the his­toric Ybor City his­tor­i­cal dis­trict of Tam­pa, the Arturo Fuente Cig­ar Ware­house is a 15,000 square foot humi­dor.”
2014 WALLHOUSE HOTEL finished
WALLHOUSE HOTEL
Wall­house Hotel brings a con­tem­po­rary design to a quite region of Ohio.
2016 HOFBRAUHAUS RESTAURANT BEER GARDEN 12
HOFBRAUHAUS RESTAURANT & BEER
Hof­brauhaus-Cleve­land required a 24,000 square foot addi­tion to accom­mo­date its grow­ing busi­ness.
Transfer station complete
3A NORTHEAST TRANSFER STATION
This mixed use project includes offices and drop off facil­i­ties for waste and recy­cling.
2014 MAIN STREET OFFICE BUILDING 9
MAIN STREET OFFICE BUILDING
This eco-friend­ly project demon­strates the mul­ti­ple green con­struc­tion meth­ods avail­able.
Unnamed 1
SMP Architecture Saves Time with ICF for Waterfront Rescue Mission
The design team at SMP Archi­tec­ture want­ed to cre­ate a safe and secure, sus­tain­able struc­ture with low main­te­nance costs for the own­ers.
2018 WHITEWATER CROSSING CHRISTIAN CHURCH 11
WHITEWATER CROSSING CHRISTIAN CHURCH
Fox Blocks pro­vid­ed a struc­tur­al sys­tem that allowed the exist­ing church to be expand­ed.
MACNAK CONSTRUCTION CORPORATE OFFICE 11
MACNAK CONSTRUCTION CORPORATE OFFICE
Mac­nak Con­struc­tion uti­lized sev­er­al new con­struc­tion prod­ucts in its new ener­gy effi­cient office build­ing.
2012 WEST VANCOUVER BC RESIDENCE 10
WEST VANCOUVER BC RESIDENCE
The 5,200 square foot cus­tom home is built on a large rock on the side of a moun­tain.