Why is the concrete limited to a placement height or lifts of 4 feet (1.2 m)?
To alle­vi­ate the pres­sure from the liq­uid con­crete, the con­crete is placed in lay­ers or lifts’. The first lift is lim­it­ed to 4′ (1.2 m) of con­crete around the perime­ter of the build­ing. This allows approx­i­mate­ly one hour for the con­crete to set-up before con­tin­u­ing with the next 4′ (1.2 m) lift. The low­er lift pro­vides sup­port for the next lift as the con­crete is placed con­tin­u­ous­ly around the build­ing in con­sec­u­tive lifts to the top of the wall.
Winter construction
Get Quicker Winter Construction with ICF
Remove Costs on your ICF Project
Two proven areas to remove costs are cor­ners and truss wire.
Building Beyond Code with ICF
While it may seem that hav­ing to com­ply with con­stant­ly-evolv­ing build­ing codes is just part of doing busi­ness in a mod­ern soci­ety, that’s not real­ly true.
Texas Tech University Fox Blocks Student Housing Dorms

Texas Tech University Fox Blocks Student Housing Dorms

Fox Blocks Insulated Concrete Forms LEED Church.wmv

Fox Blocks Insulated Concrete Forms LEED Church.wmv

Fox Blocks Crew pour Insulated Concrete Forms.mov

Fox Blocks Crew pour Insulated Concrete Forms.mov

Fox Blocks Semi Custom 40 Home Subdivision Underway

Fox Blocks Semi Custom 40 Home Subdivision Underway

Fox Blocks School Project and Speed of Production

Fox Blocks School Project and Speed of Production

Fox Blocks Curb Block Insulated Concrete Forms.MOV

Fox Blocks Curb Block Insulated Concrete Forms.MOV