When can I backfill the foundation wall?
The concrete must cure for a minimum of 7 days and the foundation wall must be laterally supported, meaning the floor system is installed supporting the top of the wall. All below grade waterproofing / dampproofing must be installed.

Revit Family Configurator

LAKESIDE RESIDENCE
Cost effective construction was possible because of the insulating qualities of the Fox Blocks system.
Terms and Conditions

SHORE ROAD RESIDENCE
It is not an overstatement to say that The Shore Road Project is the owners’ dream home.

THE PRESERVE AT MOUNTAIN VISTA
A series of homes were built together to prove the viability of ICF contributing to affordable, Net Zero homes.

KING GEORGE LANTERN HALL
Lantern Hall won the Commonwealth Award from the Virginia Chapter of the American Concrete Institute.

MILTON RESIDENCE
The owners wanted an affordable custom home that could withstand Chesapeake Bay weather.

HILLIARD BRUCE WINERY
Hilliard Bruce Winery was awarded LEED Silver Certification by the US Building Council.