Insulated Concrete Form used to Build a Warehouse
Warehouse Building Construction: How to Build a Warehouse the Right Way
Learn the key steps of ware­house build­ing con­struc­tion, from plan­ning and design to mate­ri­als and costs, to build a ware­house the right way.
Kenwood 1
KENWOOD ELEMENTARY GYMNASIUM
Rebuild­ing the Ken­wood Ele­men­tary Gym­na­si­um helped heal the com­mu­ni­ty.
Soundproof Exterior Walls Header
Improve the Comfort and Health of a Building with Soundproof Exterior Walls
The need to incor­po­rate sound­proof­ing fea­tures in the exte­ri­or walls of today’s homes and build­ings has increased in recent decades. Urban­iza­tion, pop­u­la­tion growth, and an increase in air, rail, and high­way traf­fic all have con­tributed to a wide­spread esca­la­tion of noise pol­lu­tion.
When can I backfill the foundation wall?
The con­crete must cure for a min­i­mum of 7 days and the foun­da­tion wall must be lat­er­al­ly sup­port­ed, mean­ing the floor sys­tem is installed sup­port­ing the top of the wall. All below grade water­proof­ing / damp­proof­ing must be installed.
Building Your ICF Home - Floor Attachment

Building Your ICF Home - Floor Attachment

How strong is the Fox Blocks corner 2 of 3 insulated concrete forms icf.wmv

How strong is the Fox Blocks corner 2 of 3 insulated concrete forms icf.wmv