Fox Blocks pour day Insulated Concrete Forms

Fox Blocks pour day Insulated Concrete Forms

Do I have to finish my basement walls with drywall?
All build­ing codes in the USA and Cana­da spec­i­fy that plas­tic insu­la­tion (EPS) must be cov­ered by a ther­mal bar­ri­er equiv­a­lent to 15 min­utes of fire pro­tec­tion in hab­it­able spaces. If the base­ment is clas­si­fied as hab­it­able space, then gyp­sum board must be applied but does have to taped and filled. Check with your local build­ing offi­cial.
6 Little Known Energy Wasters Affecting Your Low-Rise Construction
By iden­ti­fy­ing these ener­gy wasters, you can take the nec­es­sary steps to make the build­ing more effi­cient.
Fox Blocks Announces Membership in the NRMCA
We are excit­ed to announce that Fox Blocks is now a mem­ber of the Nation­al Ready Mix Con­crete Asso­ci­a­tion (NRM­CA).
Fox4
Cinder Block (CMU) vs. Traditional Poured Concrete Wall Foundations
We cov­er the dif­fer­ences between CMU blocks and poured con­crete foun­da­tions so that you don’t have to learn from tri­al and error.
Fox3
A Better Approach to Fire Safety with Concrete Building Design
Non-com­bustible, insu­lat­ed con­crete form (ICF) con­struc­tion is a bet­ter approach to fire safe­ty over wood con­struc­tion.

ASTM D1929 Ignition Properties of Plastic Webs \n3105051SAT 001 Report 11 15 07