Correctly Estimating the Cost of a Building Project: 5 Tips
Project cost is one of the most dif­fi­cult — and most impor­tant — esti­ma­tions for any con­struc­tion com­pa­ny to get right. You want to be able to set man­age­able expec­ta­tions for your client, but also present a bud­get that is attrac­tive enough for them to choose you as their gen­er­al or sub-con­trac­tor while still mak­ing a prof­it your­self.
2014 LAKESIDE RESIDENCE 11
LAKESIDE RESIDENCE
Cost effec­tive con­struc­tion was pos­si­ble because of the insu­lat­ing qual­i­ties of the Fox Blocks sys­tem.
911 center finished again
PHOENIX 911 EMERGENCY OPERATIONS CALL CENTER
Fox Blocks helped meet these needs and chal­lenges of this pub­lic project serv­ing the entire Phoenix met­ro­pol­i­tan area.
2018 ST JUAN DIEGO 13
ST. JUAN DIEGO
The church fea­tures unique win­dows that were accom­mo­dat­ed in the Fox Blocks struc­tur­al wall sys­tem.
2016 CABELAS 13
CABELA’S
Con­struct­ed dur­ing one of the worst win­ters in over 30 years, hav­ing over 8′ of snow fall dur­ing the 12 weeks of Fox Blocks con­struc­tion.
2013 PADUCAH MIDDLE SCHOOL 11
PADUCAH MIDDLE SCHOOL
This school has hun­dreds of com­plex shapes and sizes that were accom­mo­dat­ed by Fox Blocks.
Screen Shot 2020 04 13 at 1 27 52 PM
Fear Not - Simple and Quick ICF Foundations Can Save You Time and Money
2013 RED OAK ELEMENTARY 10
RED OAK ELEMENTARY
The vision of Red Oak Ele­men­tary is to be the mod­el of aca­d­e­m­ic excel­lence.
WINTON MONTESSORI 7
PARKER WOODS MONTESSORI SCHOOL
A key design ele­ment of this school was sus­tain­abil­i­ty.
Powell-full-finished
POWELL COUNTY EOC
Pow­ell Coun­ty Emer­gency Oper­a­tions Cen­ter is designed to meet FEMA require­ments for chem­i­cal agent emer­gen­cies and storm resis­tance.