
Why Fox Blocks ICF Safe Rooms Provide the Best Protection During Dangerous Wind Events
Glen's Contractor Tip Corner: Short Jogs
I had a call this week from a contractor who wanted to know if there was an easy way to build a two foot jog into a wall. This brought back flashbacks of when I used to attempt to interlock corners thinking the strength of the interlock was going to hold things together during concrete placement.

How to Assess Contractors for Building with ICFs

5 Construction Industry Trends in 2019
In 2019, construction industry trends welcome advancements in building methods and materials; however, the industry still struggles with ongoing labor shortages.
Fox Blocks Acquiring Key Assets of ARXX Building Products
Fox Blocks ICF announced that it will acquire select key assets from ARXX Building Products, integrating those assets into its own operations and augmenting the Fox Blocks Insulated Concrete Form (ICF) product line.
Correctly Estimating the Cost of a Building Project: 5 Tips
Project cost is one of the most difficult — and most important — estimations for any construction company to get right. You want to be able to set manageable expectations for your client, but also present a budget that is attractive enough for them to choose you as their general or sub-contractor while still making a profit yourself.
Fox Blocks Expands ICF Manufacturing to Texas and Missouri
Fox Blocks is excited to announce continued expansion of our ICF manufacturing locations! We are now being produced in Keller, TX and Nixa, MO- bringing the total to 18 manufacturing points across the US and Canada.

Tips for Hiring & Working with Residential Architects
Fox Blocks Announces Membership in the NRMCA
We are excited to announce that Fox Blocks is now a member of the National Ready Mix Concrete Association (NRMCA).

What Is Construction Phasing and Why Is It Important?
Construction phasing is revolutionizing the way we approach building projects. By dividing a project into manageable segments, it is a strategic method for tackling large-scale developments while also maintaining operational continuity.