What's In Your Air?
We face environmental pollution every day we step outside our door.
When can I backfill the foundation wall?
The concrete must cure for a minimum of 7 days and the foundation wall must be laterally supported, meaning the floor system is installed supporting the top of the wall. All below grade waterproofing / dampproofing must be installed.

Continuous Wall Foundation: Building a Strong Continuous Load Path from Foundation to Roof

Fox Blocks Wins Big at the 2020 ICF Builder Awards

How to Assess Contractors for Building with ICFs

Combat Rising Construction Labor Costs with ICF

