What is the R-Value?

The clear R‑Value of an Fox Blocks is R22, how­ev­er cur­rent Ener­gy codes rec­og­nize the lack of ther­mal bridg­ing in an ICF and the con­tri­bu­tion of the mass con­crete on the influ­ence of the ther­mal per­for­mance. Whole wall cal­cu­la­tions indi­cate a Fox blocks wall assem­bly pro­vides an R24 rat­ing.

The con­tin­u­ous dou­ble lay­er (inside and out­side) of insu­la­tion, the elim­i­na­tion of ther­mal bridg­ing and min­i­mal air infil­tra­tion through the mass con­crete wall assem­bly, allows Fox Blocks walls to per­for­mance in the high per­for­mance wall assem­bly cat­e­go­ry. Com­plet­ing the enve­lope with ener­gy effi­cient win­dows and doors and roof insu­la­tion, Fox Blocks homes can eas­i­ly meet and exceed ener­gy code require­ments and exceed the min­i­mum require­ments for Ener­gy Star and Ener­Guide. A Fox Blocks struc­ture requires 44% less ener­gy to heat and 32% less ener­gy to cool.

1
3 Examples of Flood Resistant Architecture
Flood­ing is relent­less. It destroys homes, dis­places fam­i­lies, and leaves busi­ness­es in ruins.
Gananoque Rendering 1
ISLAND HARBOR CLUB CONDOS
The con­trac­tor need­ed a build­ing solu­tion that would pro­vide a sus­tain­able devel­op­ment that would stim­u­late the local econ­o­my and pre­serve the his­toric feel of the com­mu­ni­ty. In addi­tion to the envi­ron­men­tal con­sid­er­a­tions, the com­mit­ment to pri­vate, ener­gy effi­cient units was a sell­ing point of build­ing with Fox Blocks ICF.
1
How to Build a Shopping Mall: Key Steps and Considerations
Shop­ping mall con­struc­tion is a com­plex and reward­ing process that requires care­ful plan­ning, effi­cient exe­cu­tion, and sus­tain­able design. From site selec­tion to final inspec­tions, every step con­tributes to cre­at­ing a thriv­ing retail des­ti­na­tion.

1.01.01 Guia De Informacion Tecnica Y Del Producto

1.01.01 Technical Information & Product Guide

1.01.01 Technical Information and Training Guide (French)

Fox 1
ICF Home Plans are Versatile and Limitless in Design Options
2016 CABELAS 13
CABELA’S
Con­struct­ed dur­ing one of the worst win­ters in over 30 years, hav­ing over 8′ of snow fall dur­ing the 12 weeks of Fox Blocks con­struc­tion.
Reduce Moisture Problems with ICF Construction
Reduce Moisture Problems with ICF Construction
You can avoid stud-fram­ing mois­ture prob­lems by choos­ing a mois­ture-resis­tant insu­lat­ed con­crete form (ICF) foun­da­tion for your new home.