Where can I purchase the product?
Fox Blocks has a wide-ranging network of knowledgeable product distributors and trained installers across North America; contact Fox Blocks Customer Service to find the closest Fox Blocks product distributor or trained installer in your area.

Cavity vs. Continuous Insulation: Discover the Best Option for Maximum Efficiency
When can I backfill the foundation wall?
The concrete must cure for a minimum of 7 days and the foundation wall must be laterally supported, meaning the floor system is installed supporting the top of the wall. All below grade waterproofing / dampproofing must be installed.

The Benefits of Building Multi-story Residential Buildings with ICF Blocks

Building Stronger Hotels with ICF Blocks

The Best Vapor Systems for Basement Walls
Construction Detail Drawings

Maximizing Energy Efficiency and Comfort with Insulated Concrete Forms
Energy costs keep climbing, making insulation energy efficiency more important than ever. Buildings that lose heat in the winter and trap it in the summer waste energy and drive up utility bills.