Correctly Estimating the Cost of a Building Project: 5 Tips
Project cost is one of the most difficult — and most important — estimations for any construction company to get right. You want to be able to set manageable expectations for your client, but also present a budget that is attractive enough for them to choose you as their general or sub-contractor while still making a profit yourself.
Is an ICF house faster to build?
The assembly and placement of concrete may take the same time as to build with conventional methods. The advantage with Fox Blocks is that the walls are now insulated, have a vapor and air barrier installed and are ready for finishes once the windows and roof are installed. These benefits will save weeks and/or months depending on the size of the projects.
When can I backfill the foundation wall?
The concrete must cure for a minimum of 7 days and the foundation wall must be laterally supported, meaning the floor system is installed supporting the top of the wall. All below grade waterproofing / dampproofing must be installed.

How Long Does It Really Take to Build a House?
Whether you’re building your dream home or a cozy cottage, knowing the timeline is essential. However, one of the first questions that come to mind is, “How long will it take to turn these blueprints into my home?” Understanding the timeline is crucial for planning, budgeting, and ultimately enjoying the process of watching your house come to life.

CMU Walls: Advantages, Disadvantages and A Better Option
Insulated concrete form blocks provide a host of advantages over traditional CMUs, including better energy efficiency, easier construction, and improved resilience.