Site preparation; footing trench is dug.
-
Concrete footings are poured.
-
ICF's are placed in the footing trench.
-
Cutting a Fox Blocks ICF with a hand saw.
-
Placing the first row of ICF's and rebar.
-
Here is a corner pipe.
-
More rows of ICF's are attached to form a wall.
-
Wall braces are attached.
-
Scaffolding is attached to the wall braces to allow workers access to the higher areas.
-
Waterproofing is attached to exterior areas that will be below ground. A drain pipe is also visible in this photo.
-
Completed ICF walls waiting for the concrete truck.
-
Concrete flows into the ICF cavity.
-
Wet concrete being vibrated.
-
Bolts being installed in the wet concrete.